Hi Lan Chi – Fanshawe is not considering building level limits. We’ve limited the number of open buildings to minimize the required cleaning and monitoring. We’ve also restricted capacities at the room level. We have one room layout for 100 seats for testing (Gym) that will be used intermittently throughout the summer (apprenticeships) and 2 large heavy-equipment labs with 60 students. All other rooms are 30 or less.
For the buildings that are open, assuming all classes are used simultaneously, only 1 exceeds 100.
hope this helps.
…Rich